Place of Origin: | China |
---|---|
Brand Name: | OEM/ODM |
Certification: | CE, RoHS |
Minimum Order Quantity: | 10 pcs |
Price: | sales@sogootech.com |
Packaging Details: | PP bag+ paper carton |
Delivery Time: | 3-20 days depends on quantity |
Payment Terms: | Paypal,T/T, Western union |
Supply Ability: | 100000 pcs per week |
Product Name: | 3m White BBU DC Power Cable Assembly 1 Year Warranty | Application: | BBU |
---|---|---|---|
Key Words: | BBU DC Power Cable Assembly | Warranty: | 1 Year |
Connector Type: | PSU-AC Power Cord | Color: | Black |
Highlight: | Huawei BBU Power cord,BBU power cable assembly,Huawei BBU DC Power Cable |
Power D-sub DB3 3V3 solder for wire female 10A 20A 30A 40A connector for 48V DC telecommunication DC power cable, wide used for Huawei, ZTE, risconda PSU.
Product Name | high current d-sub 2v2 3v3 connector & cable assembly |
Specification: | Find them at below pictures or contact us to get it |
Certification: | UL,SGS, MSDS, CE, ISO9001,ISO14000,ROHS,REACH |
Sample: | Free |
MOQ: | Most product no MOQ limit , Small order can be accepted |
Delivery: | Within stocks products will be send out in 3working days,customized products are sent out around 7working days |
Terms of trade: | EXW,FOB,CIF,CPT ect |
Payment Terms: | T/T,Paypal , Western Union |
Package: | Connector 1000pieces Per PE Bag with Label,Terminal in roll, put into 50*50*40cm paper box,export standard Carton with packing list and shipping mark |
Application: | Widely used in telecommunication equipment ,computer ,controllers ,alarm security ,appliance instruments Auto |
Service: | OEM&ODM are welcomed |
FAQ
1) How can I place order?
A: You can contact us by email about your order details, or place order on line.
2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T (HSBC bank) and Paypal, Western Union are the most usual ways we are using.
3) What’s the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pr -epaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 7-15 days if we don’t have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
4)How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.
5)How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.
Look forward to your inquiry to 3m White BBU DC Power Cable Assembly 1 Year Warranty.
Cable assemblies